This has been a whirl-wind of a week. It all started Monday when NO- ONE showed up at the house to do anything. I had been asking for our solar tube lights to be installed for about 3 months. The trim guy came Monday morning to install, builder wouldn't decide where to put the lights (which I had marked in the attic during framing), trim guy left with out installing the lights. Then we had about $5,000 worth of lights delivered and set in the driveway because there was no one there to open the house. I was furious! The next morning I had a serious come to Jesus with Builder. Amazingly enough, on Wed. the electrician, cabinet guys, tile guys, trim dude, drop ceiling installer, heating and air, and an inspector all showed up at the house. That is the way I like to see things work.
The solar tubes were installed, and I highly recommend them. In the day time you can go into either of the boys bathrooms and not need to turn on a light!
The heat was turned on and runs at a low temp to help dry the tile.
The tile is moving right along.
There are plug covers on plugs and light switches.
My cabinets have knobs on them!!!
It seems all my fussing may have been worth it- which is a shame because I am a whole lot better being nice than not.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment